For this project, we were dealing with an installation with more power. The master switch of 400A drives 2 pumps of 55kW and 2 industrial fans of 7,5 kW.
PCA developped 8 mobile pilot installations. With these pilote installations Vlakwa can offer small & medium companies and the agri- & horticultural sector a temporary watertreatment installation. Vlakwa can research with these installations how to diminish the water consumption and respect the environmental directions.