At higher outside temperatures, the efficiency of air-cooled chillers decreases. The higher energy consumption of the chillers can be reduced by means of a spraying system.
During the extraction of natural gas, cavities are created where stagnant water accumulates. If the soil layer contains a high salinity, this water transforms into brine with a small amount of methane. We built a tailor-made methane stripper to solve this problem.
PCA designed and build an installation for the treatment of waste water at Gustav Wolf. In addition, we provided the cooling water circuit and installed everything necessary to distribute the groundwater throughout the factory.
PCA designed a tailor-made water purification system for Corradi that combines a vacuum evaporator with an ion exchanger in a closed circuit. This results in a zero discharge of waste water.
Iron-rich groundwater caused problems during the production process at Barry Callebaut. Our iron removal installation solves these problems in three phases. You can read about them here.